The High Dam is located just south of the city of Aswan in Egypt.
HISTORY
The High Dam was constructed not only to regulate the yearly flood of the Nile, but also to create a water reservoir capable of storing water to prevent famine during severe droughts. Construction of the Dam began in 1960 as a national project, undertaken by Egyptian president Nasser who nationalized the Suez Canal to provide funds for the project. With the American and the British refusing to secure a loan for the construction, it was the Soviets that designed the earth structure and provided the equipment required to build the power station. During the course of construction, provisions were made to repatriate the Nubian inhabitants, and, in a multi-national effort, to relocate The Great Temple of Abu Simbel.